Fifteen steps. Three phases.

One path from first conversation to handover.

Study. Design. Build.

We study your goals, site and budget first.

Start a project

Fifteen steps and one accountable team, with a clear decision at every stage and no surprises on cost or schedule.

Steps on every project
15
Phases, study to handover
3
Project manager throughout
1
Regions served
3
Repeat business
80–90%

From study to handover

Three phases, fifteen steps. Open any step to see what you decide and what we deliver.

Steps 1 to 5

Preliminary Study

Understand your goals, site and budget, and see a first design direction with an estimate before you commit.

We listen to your goals, timeline and constraints, and explain how we work.

You decide: Your goals, timeline and who needs to be involved.

We deliver: A clear account of how we work and what happens next.

We walk the site, review conditions and agree on what success looks like.

You decide: What success looks like for you.

We deliver: A site review and a written summary of conditions and constraints.

We define the spaces, performance and budget range the project must meet.

You decide: The spaces you need and the budget range.

We deliver: A program that fits the budget, with the trade-offs made visible.

We check zoning, permitting, utilities and risks that could affect cost or schedule.

You decide: How much risk you are willing to carry.

We deliver: Findings on zoning, permits and utilities that could change cost or schedule.

You receive an integrated preliminary design with an early cost estimate to decide on.

You decide: Whether to go on to full design.

We deliver: An integrated preliminary design with an early cost estimate.

Steps 6 to 10

Design Development

Develop the drawings, selections and contract price together, with your input at every decision.

We confirm scope, fees and the schedule for design and pricing.

You decide: Scope, fees and the design schedule.

We deliver: An agreement that sets out what is designed, priced and when.

Plans, elevations and massing are refined with your feedback.

You decide: Layout, massing and priorities.

We deliver: Plans, elevations and massing, refined with your feedback.

Systems, materials and finishes are chosen and coordinated.

You decide: Materials, finishes and systems.

We deliver: Coordinated drawings and a schedule of selections.

Builders and trades price the design, and we balance cost against your priorities.

You decide: Where to save and where to invest.

We deliver: Trade pricing against the design, with options and what each costs.

Final drawings are issued and permit applications are filed.

You decide: Final approval of the drawings.

We deliver: Issued drawings and filed permit applications.

Steps 11 to 15

Construction

Build to the plan, with one point of contact, regular reporting and a thorough handover.

We finalize the contract and award trade packages.

You decide: Approval of the contract and the trade awards.

We deliver: A final contract and awarded trade packages.

The site team, safety plan and detailed schedule are put in place.

You decide: Access, working hours and site rules.

We deliver: A site team, a safety plan and a detailed schedule.

We build, inspect each stage and report on cost and schedule.

You decide: Any change you want, once its cost is known.

We deliver: Inspected stages and regular cost and schedule reports.

We complete final items and test building systems to confirm they perform.

You decide: Sign-off on completed work.

We deliver: Final items finished and building systems tested.

You receive training, documentation and warranty support.

You decide: Who receives training and documents.

We deliver: Training, documentation and warranty support.

Built on discipline

Four commitments that hold in every phase and on every project.

  1. Safety first

    A site safety plan before mobilization, daily oversight, and authority for anyone to stop unsafe work.

  2. Clear communication

    One project manager, a regular reporting rhythm and no surprises on cost or schedule.

  3. Quality control

    Defined standards and inspection before each trade hands over to the next.

  4. Local partnerships

    Trusted local trades and suppliers, and room for new firms to earn a place.

Frequently Asked Questions

Process FAQs

Start a project

No. The first phase ends with an integrated preliminary design and an early cost estimate, so you can decide with real numbers before you go on.

It depends on the size and complexity of the building. After the preliminary study we give you a schedule for the design and construction phases.

Yes. We price a change before it goes ahead, so you decide with the cost and the effect on schedule in front of you.

One project manager, from the first meeting to handover, who reports to you on cost, schedule and quality.

Start with a conversation

Tell us what you are planning. We reply within one business day to set up a call and suggest the right first step.

Office
6505 Liberty Road, Baltimore, MD 21207
Do you already have plans or drawings?